• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

R324.1.3.1 Acceptance of Alternative Methods Establishing the Design Flood Elevation

2010 Residential Code of NY > 3 Building Planning > R324 Flood-Resistant Construction > R324.1 General > R324.1.3 Establishing the Design Flood Elevation > R324.1.3.1 Acceptance of Alternative Methods Establishing the Design Flood Elevation
JUMP TO FULL CODE CHAPTER
In areas prone to flooding as identified in Table R301.2(1) where a base flood elevation has not been determined, the code enforcement official may accept the use of other sources to establish the design flood elevation, including, but not limited to, New York State, the U.S. Army Corps of Engineers, the Natural Resources Conservation Service or another authoritative source, such as historical data.

Related Code Sections


R324.1.3.1 Building Planning, Acceptance of Alternative Methods Establishing the Design Flood Elevation
accept the use of other sources to establish the design flood elevation, including, but not limited to, New York State, the U.S. Army Corps ...
2010 Residential Code of NY > 3 Building Planning > R324 Flood-Resistant Construction > R324.1 General > R324.1.3 Establishing the Design Flood Elevation > R324.1.3.1 Acceptance of Alternative Methods Establishing the Design Flood Elevation
Help Contact Us Privacy Terms
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Compare
Code Compare
Highlight differences between any two building codes.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE