• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

611.1.4.1 Acceptance

Green Construction Code 2012 of Maryland > 6 ENERGY CONSERVATION, EFFICIENCY AND CO2e EMISSION REDUCTION > 611 Energy Systems Commissioning and Completion > 611.1 Mechanical Systems Commissioning and Completion Requirements > 611.1.4 Preliminary Commissioning Report > 611.1.4.1 Acceptance
JUMP TO FULL CODE CHAPTER
Buildings, or portions thereof, shall not pass the final mechanical inspection until such time as the code official has received a letter of transmittal from the building owner acknowledging that the building owner has received the Preliminary Commissioning Report.

Related Code Sections


1401.3 Performance Compliance Methods, Acceptance
, compliance with this section shall be accepted by the code official ...
Existing Building Code 2015 of Maryland > 14 Performance Compliance Methods > 1401 General > 1401.3 Acceptance
611.1.4.1 ENERGY CONSERVATION, EFFICIENCY AND CO2e EMISSION REDUCTION, Acceptance
Buildings, or portions thereof, shall not pass the final mechanical inspection until such time as the code official has received a letter ...
Green Construction Code 2012 of Maryland > 6 ENERGY CONSERVATION, EFFICIENCY AND CO2e EMISSION REDUCTION > 611 Energy Systems Commissioning and Completion > 611.1 Mechanical Systems Commissioning and Completion Requirements > 611.1.4 Preliminary Commissioning Report > 611.1.4.1 Acceptance
1908.10.3 Concrete, Acceptance Criteria
The average compressive strength of three cores from the in-place work or a single test panel shall equal or exceed 0.85 f ' c with no single core ...
Building Code 2015 of Maryland > 19 Concrete > 1908 Shotcrete > 1908.10 Strength Tests > 1908.10.3 Acceptance Criteria
1908.10.3 Concrete, Acceptance Criteria
The average compressive strength of three cores from the in-place work or a single test panel shall equal or exceed 0.85 f´ c with no single core ...
Building Code 2018 of Maryland > 19 Concrete > 1908 Shotcrete > 1908.10 Strength Tests > 1908.10.3 Acceptance Criteria
513.18 Exhaust Systems, Acceptance Testing
Devices, equipment , components and sequences shall be tested in accordance with the International Fire Code ...
Mechanical Code 2018 of Maryland > 5 Exhaust Systems > 513 Smoke Control Systems > 513.18 Acceptance Testing
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE