To require the use of recognized authoritative documents or design guides for analysis, measurement of performance and determination of criteria used to evaluate compliance with the performance requirements of this code. See Chapter 2 for definitions.
Design approaches shall utilize authoritative documents and design guides to demonstrate that designs are based on applicable and valid technical and scientific methodologies.
Design documents shall indicate the method by which the design and construction are to be verified and applicable systems are to be measured.
Testing and inspection of materials and systems shall be based upon applicable authoritative documents and design guides.
Design professionals shall utilize acceptable methods. Construction documents shall contain the design approach, analysis, research, computation and criteria for acceptance that specify the applicable design guides, and authoritative documents utilized to demonstrate that design objectives are met.
Design documents shall include design verification methods that are required to demonstrate compliance with design objectives and applicable authoritative documents and design guides.
Documents that do not meet the criteria for authoritative documents or design guides shall comply with the individually substantiated design method criteria in Appendix C.
Designs that propose to use documents that do not meet the criteria for authoritative documents or design guides shall not be permitted unless approval is given by the code official. The resulting performance-based design shall undergo an independent peer review process.
Related Code Sections
103.3.3.4 General Administrative Provisions, Acceptable Methods
Design professionals shall use authoritative documents or design guides to determine testing and verification methods for selecting building ...
Performance Code for Buildings and Facilities 2012 of South Holland, IL > 1 General Administrative Provisions > 103 Administrative Provisions > 103.3 Performance Requirements > 103.3.3 Design Professionals' and Special Experts' Responsibilities > 103.3.3.4 Acceptable Methods
Section 104 General Administrative Provisions, Acceptable Methods
Design professionals shall utilize acceptable methods ...
Performance Code for Buildings and Facilities 2012 of South Holland, IL > 1 General Administrative Provisions > 104 Acceptable Methods
104.1 General Administrative Provisions, Objective
To require the use of recognized authoritative documents or design guides for analysis, measurement of performance and determination of criteria used ...
Performance Code for Buildings and Facilities 2012 of South Holland, IL > 1 General Administrative Provisions > 104 Acceptable Methods > 104.1 Objective
104.2 General Administrative Provisions, Functional Statements
indicate the method by which the design and construction are to be verified and applicable systems are to be measured ...
Performance Code for Buildings and Facilities 2012 of South Holland, IL > 1 General Administrative Provisions > 104 Acceptable Methods > 104.2 Functional Statements
104.2.1 General Administrative Provisions, Approved Methodologies
Design approaches shall utilize authoritative documents and design guides to demonstrate that designs are based on applicable and valid technical ...